Aluminum alloy doors and windows installation safety technology

Aluminum alloy doors and windows installation safety technology

鋁合金門窗安(ān)裝(zhuāng)安(ān)全技(jì )術交底

鋁合金門窗安(ān)裝(zhuāng)安(ān)全技(jì )術交底

鋁合金門窗安(ān)裝(zhuāng)安(ān)全技(jì )術交底

Construction preparation

Technical preparations

The position and size of the door and window openings are in line with the construction drawings, and the technical disclosure work should be done according to the construction requirements.

Material preparation

The specifications and models of aluminum alloy doors and windows should meet the design requirements, complete with hardware accessories, with product factory certificate, material inspection report and stamped with the seal of the manufacturer.

The inspection of wind pressure resistance performance, air permeability performance and rainwater rope head performance shall meet the design requirements and relevant standards.

For doors and windows with thermal insulation requirements, the thermal insulation performance shall meet the design requirements and the provisions of relevant standards.

Anti-corrosion materials, caulking materials, sealing materials, anti-rust paint, cement, sand, connecting plates, etc. meet the design requirements and relevant standards.

main equipment

Aluminum alloy cutting machine, electric hand drill, impact drill, small electric welding machine, nail gun, glue barrel, glass suction cup, wire saw, hand hammer, wrench, screwdriver, wooden wedge, pallet, wire sinker, spirit level, steel tape measure , ink fountain, etc.

working conditions

The main structure has been accepted by the relevant quality departments. The engineering quality inspection has completed the handover procedures.

Play the center line of doors and windows according to the size required by the drawings, and play the indoor +0.5m horizontal line. Doors and windows should be installed along the edge of the full-height pop-up window of the building.

Check whether the size and elevation of door and window openings meet the design requirements. Doors and windows with embedded parts should also check whether the number, location and embedding method of the embedded parts meet the design requirements.

Check the aluminum alloy doors and windows. If there are split edges, channeling angles, uneven warping, excessive deviation, surface damage, deformation, loosening and large appearance color difference, it should be solved through consultation with relevant personnel, and can only be installed after passing the treatment and acceptance.

Paste protective film on the surface of aluminum alloy doors and windows. Check the protective film before installation. If it is damaged, it should be repaired and then installed.

construction technology

Process flow

Elastic wire positioning → door and window opening treatment → anti-corrosion treatment → aluminum alloy door and window unpacking and inspection → aluminum alloy door and window installation → aluminum alloy door and window frame in place and temporary fixation → aluminum alloy door and window frame fixing → treatment of the gap between the door and window frame and the wall → Cleaning → door and window sash and door and window glass installation → hardware accessories installation

operating process

1 Snap line positioning

Use a large line pendant along the full height of the building (the theodolite should be used to find the vertical line for high-rise buildings) to measure the doors and windows, and mark the doors and windows on each floor. And copy the actual distance between the door and window openings from the door and window edges layer by layer, and record and mark the ones that need to be processed.

The horizontal position of doors and windows should be based on the horizontal line of +0.5m in the floor room. Each floor must keep the same level of the skin under the window, and the lower mouth of the aluminum alloy door is 0.51m.

The installation position in the thickness direction of the wall shall be determined according to the design requirements and the Guandu of the window sill. In principle, the exposed size of the window sill board in the same room shall prevail, and the window sill board should extend 5mm below the aluminum alloy window.

2 Door and window opening treatment Door and window openings that are offset, not vertical or square should be chiseled or plastered.

3 Anti-corrosion treatment

When there are design requirements for anti-corrosion treatment on the four outer surfaces of the door and window frames, they shall be treated according to the design requirements. If the design does not require it, it can be painted with anti-corrosion paint or pasted with plastic film for protection, so as to avoid cement mortar directly contacting the surface of aluminum alloy doors and windows, resulting in chemical reactions and corrosion of aluminum alloy doors and windows.

When installing aluminum alloy doors and windows, if connecting iron parts are used for fixing, it is best to use stainless steel parts for installation metal parts such as connecting iron parts and fixing parts. Otherwise, anti-corrosion treatment must be carried out to avoid electrochemical reaction and corrosion of aluminum alloy doors and windows.

4. The aluminum alloy window should be fixed on the aluminum alloy bed through the water according to the actual requirements, and the position should be correct and the installation should be firm.

5 Installation of aluminum alloy doors and windows in place According to the drawn door and window positioning lines, install aluminum alloy door and window frames, and then temporarily fix them with wooden wedges.

6 Fixing of aluminum alloy door and window frame The aluminum alloy door and window frame and the wall are generally connected with fixing pieces. The fixing pieces are mostly 1.5mm thick galvanized sheets, and the length is processed according to the needs of the site.

The connection between the road alloy door and window frame and the wall opening should be firm and reliable, the distance between the fixing points should not be greater than 600mm, and the distance from the frame corner should not be greater than 180mm.

Previous : None
Next : None
Previous : None
Next : None

Address: East of Fukang Road, Baishazhou Industrial Park, Yanfeng District, Hengyang City, Hunan Province

Contact: He Chunsheng   13825758796         Customer Service Hotline:0734-2819993         Email:hhe8796@honghuayc.com      Links: Dongguan Honghua

Copyright ◎2022 Hunan Yancheng Honghua Electronic Technology Co., Ltd.     Brand One Web provides technical support   京ICP證000000号

成全影视大全在线观看国语 免费视频看片APP 坤坤寒进桃子里嗟嗟嗟视频 最好免费观看高清在线 夫妇交换做爰4 花开如梦电视剧全集在线播放 在线高清电视观看免费视频 公主很忙(N)作者 甜烟简介 妈妈吃了春晚药后 日本WINDOWSSERVER7777 无码精品一区二区三区四区 邻居的丰满人妻HD学生 出轨的女人 欧美经典影片视频 出差征服艳人妻HD 老色鬼久久AV综合亚洲健身 亚洲欧美一区二区三区孕妇写真 少女在线观看高清完整版免费动漫 十九岁免费观看全集完整版 特大黑人巨交吊性XXXX 欧美成人A猛片在线播放 孤男寡女免费观看电视剧战狼4影视大全 青苹果乐园影院电视剧免费播放 老年夫妻同房干涩没水怎么治 星空影院在线观看免费观看电视 国产AV精品一区二区凹凸婷婷 欧美尺码日本尺码专线 完美世界在线观看免费完整观看 跟40岁的少妇做一次就不硬了 无节操摄影部 很黄的吸乳A片三男一女 樱花动漫官网官方进入网站首页 姜娆被闺蜜男友CAO翻H 图书馆的女朋友 十八岁以下请勿观看免费网名 GOGOGO高清完整版 免费大片APP 第一次爱的人免费播放第3季 最近最新MV字幕免费观看 成人做爰66片免费看网站 被教练伦流澡到高潮H漫画视频 樱花动漫在线观看免费完整版影视 办公室可不可以干湿你的床垫 成全大全免费观看完整版高清下载 瞒着老公加班的HR中字 国产精品嫩草久久久久 我的漂亮的小瘦子3 妈妈在等你免费观看电视剧 男人边吻奶边挵进去A片小说 番茄影视大全在线观看免费版 免费PS大片调色教程 年轻漂亮秘书6 中文字幕在线观看 韩国电影中文字幕2020年 和漂亮老师做爰6 他用嘴巴含着我奶头吸怎么办 成人无码亚洲精品午夜精品 美妇岳妇的肉泬目录 老师的丰满大乳奶 适合夫妻俩晚上看电影的文案 男配也要被爆炒吗(N)作者:筏喻 日韩毛片 韩漫免费阅读漫画的网站有哪些 类似XL的动漫有哪些 少妇厨房愉情2 扦插BB有什么好处视频 人马畜禽COMPANY 教授H1VL1升温 欧美天天澡天天爽日日A 公交车短文100篇最简单回复 女人脱精光直播APP大全 私人影院家庭影院 成人A片在线观看WWW涩欲满 无敌高清在线观看免费 永久免费的日漫APP软件 4D玉蒲团奶水都喷出来了免费 女员工的滋味 妈妈你真棒插曲快来救救我电影 亚洲永久无码7777KKK GOGOGO大但人文艺术创作背景